Turnover

Would this turnover package pass your owner's review?

Turnover answers that before the owner asks it — one readiness score per project, based on what's tested, what's still open, who's signed, and the evidence behind every failure.

  • ✓One clear score. Scored the way an owner reviews a package, with blockers named. See how it works.
  • ✓Built from the owner's side. Shaped by what gets packages accepted at Microsoft and AWS scale.
  • ✓Pass / fail / N/A, notes and photos. Fails auto-build the punch list. Works offline, syncs later, exports as a signed, client-branded PDF.

For commissioning managers, controls leads, and QA/QC teams done rebuilding test sheets in Excel.

Pick a topic below — Overview, Readiness, Demo, Pricing, or About — and see only what you came for.

Start with a free pilot project

Your first Turnover project is free — full checklist set for one system, one level, no card required. Run it on a real job and judge it there.

Pilot requests go to turnovercx@gmail.com — email us there, or use the form below to build your request.

Submitting builds your pilot request summary on this page — email it to turnovercx@gmail.com, and your Turnover pilot gets set up from there.

Your pilot request is ready


              
Email to turnovercx@gmail.com

Send the request to turnovercx@gmail.com from your work email so your pilot is tied to the right project. Keep the reference code — it identifies your pilot.

Two technicians testing a circuit breaker in a data center switchgear lineup, one holding a laptop connected to the breaker
FIELD VERIFICATION ON LIVE SWITCHGEAR — THE WORK THESE CHECKLISTS ARE BUILT FOR. PHOTO: KAHANE GROUP

Explore what matters to you

No wall of text. Choose a tab and dig into just that part.

How it works

Three steps. No new platform to learn, no templates to maintain.

STEP 01

Pick system & level

EPMS or BMS, L1–L5. Turnover builds the checklist from field-tested sequences for that system.

STEP 02

Work it in the field

Mark pass, fail, or N/A. Add notes and a photo on fails. Works offline — fails auto-build the punch list.

STEP 03

Turn it over

Get CxA, GC, and owner sign-off, then export a client-branded PDF — checklist, notes, photos, and punch list, ready to send.

Built for how a level actually closes out

Six things commissioning managers kept asking for — now in every run.

Photo evidence

Photos on failed tests

Attach a photo to the failed item. It stays on the punch list and prints in the PDF — no guessing which unit it was at retest.

Sign-off workflow

Signed at every level, L1 to L5

CxA, GC, and owner each sign before a level closes. See at a glance who's signed and who you're still waiting on.

Client-branded PDFs

The package carries your client's brand

Your client's logo and colors on every PDF, cover to punch list. Send it as-is.

Offline mode

Works on site, with no signal

Full checklist offline — pass / fail, notes, photos. Syncs automatically when signal returns.

Readiness check

Confirm the site is ready the day before

The day before, EC, GC, and CxA confirm power, access, and prerequisites — so crews don't show up to a site that isn't ready.

Pilot onboarding

Your private workspace in one click

Private workspace + invite code in one click. No setup to chase before the first test.

What the live app does now

Traceability, risk, and faster field data — six more tools in the live app.

Standards traceability

Every test cites its standard

Every test shows its standard clause — NETA, NFPA, ASHRAE, IEEE, Uptime. Your spec overrides the standard when it's stricter. The answer is on the item, not in a binder.

Punch severity A / B / C

Severity that means something

A blocks acceptance. B blocks IST. C is cosmetic. See what holds up turnover at a glance. Signed levels auto-generate a completion certificate.

Live top risks

See what is most at risk, next

At the top of the project: overdue tests, unowned punch items, blocked and aging failures, and every open Severity A — before it comes up in a meeting.

Voice capture

Dictate it, do not type it

Tap and talk. Dictate notes and punch comments hands-free — they land on the right test, fuller than typing on a phone in gloves.

Nameplate scanning

Photograph the nameplate, skip the typing

Photograph a nameplate and Turnover reads model, serial, voltage, and ratings into the record. No retyping in a dark electrical room.

Pilot metrics

Proof the pilot is working

Per workspace: first-submission acceptance, retest rate, and time saved vs. Excel. Proof the pilot worked, where the work happened.

L1

Design & factory

Submittal and sequence-of-operations review, points lists, factory witness test items.

L2

Installation

Component-level verification: devices installed per drawings, labeled, terminated, and addressed.

L3

Startup

Pre-functional checks and startup: point-to-point, sensor calibration, rotation, safeties.

L4

Functional performance

System-level FPTs: failover, staging, load changes, alarms, and control response under real conditions.

L5

Integrated systems

IST scenarios across EPMS and BMS together: utility loss, generator run, full-building response.

EPMS — electrical

Switchgear, UPS, PDU and RPP metering, breaker status and alarms, generator and ATS integration, power quality points, and utility-loss sequences — verified from the device to the head-end graphic.

BMS — mechanical

Chiller plant, CRAH/CRAC units, air handlers, pumps and VFDs, leak detection, temperature and humidity control, and the alarms your operators will actually live with after turnover.